This facility turns landfill gas into pipeline spec Renewable Natural Gas.

Project Details

Keeley Construction installed the structural steel pipe racks, process and utility piping, and set all the equipment for a greenfield RNG facility. Once completed, this facility turned landfill gas into pipeline spec Renewable Natural Gas. Piping consisted of both carbon steel and stainless steel from ½” to 24”. The project was located in Manassas, Virginia and was completed on schedule. The project duration was 10 months of construction. The overall peak manpower was approximately 40 craft.