Grupo Ortiz 7V
Keeley Construction unloaded and installed 351,288 modules and 349 torque tubes that spanned across a 4,000-acre site.
Project Details
Keeley unloaded and installed 351,288 modules (597 LDs), and 349 torque tubes that were delivered on 332 pallets. The installation was across a 4,000-acre site. The project was over a 5.5-month duration and had over 100 craftspeople on site. Grupo Ortiz is a repeat client for Keeley, and we served them across multiple scopes.