top of page

RNG Facility (Virginia)

This facility turns landfill gas into pipeline spec Renewable Natural Gas.

Keeley Construction installed the structural steel pipe racks, process and utility piping, and set all the equipment for a greenfield RNG facility. Once completed, this facility turned landfill gas into pipeline spec Renewable Natural Gas. Piping consisted of both carbon steel and stainless steel from ½” to 24”. The project was located in Manassas, Virginia and was completed on schedule. The project duration was 10 months of construction, with the overall peak manpower at approximately 40 craftspeople.

Project Details

bottom of page