CIBC BANK USA
Brentwood, MO
L. Keeley Construction was selected by the client to build out their 10th-floor office space with the intent to move their employees from the second floor so that a new business group could move in. In addition to the 10,400 SF of office space being built out, L. Keeley was also asked to re-cable their aging data infrastructure within the entire second-floor office space to new cat-6 cable.
The project also included the renovation of a portion of their existing second-floor space to convert closet and conference room space into additional interior offices with frameless glass office fronts, all while the new business group occupied the surrounding offices.
L. Keeley utilized our internal Quality team to address specific challenges and communicated effectively with the client about our strict safety philosophy. The client was very satisfied with the final project and recognized the project manager for his performance and reliability.